Introduction
- Compliance with specifications: Perfecting 3 major functions
Three major functions are planned based on the functional requirements of the system, i.e., quotation, scheduling and settlement
- Humanized planning: Adopt the user-centered design
Data from resources monitoring management systems and Taiwan Power Company’s public information is collected and sorted in order to integrate functions such as provision of reference for quotation decision making, notifications, bid management, etc. into the system
- System integration: Maximize the system performance
All the functions related to details and specifications of TPC’s platform in the ancillary service market have been integrated into the system, and all file formats required, connection-oriented communications, protocol conversion, service quality indicators computation, statement calculations, etc. are completed automatically by the system
- Professional technologies: Assemble software and hardware services
Software and hardware integration service is provided on the ancillary service architecture with professional technologies, such as information communication, electrical control, software development, etc
Introduction of System Interface
System Features
- Simple operation interface that makes searching easy
- Customize different function requirements
- Significantly cut down on operation labor costs
- Enhance operational performance of enterprises
Service Items
Introduction
- iVPP Platform
- Communication interfacing
- Field connection testing
- Data collection
- Day-ahead market bidding management
- Cloud server
Scope of Service
- Energy storage system
- Factory
- Major power users
- Power plant
Products
- iBOX communication integration solution
- iVPP Platform
IEC 61850
- IEC 61850 is an international power standard communication protocol, which was formulated by the International Electrotechnical Commission (IEC) to define communication for intelligent electronic devices (IED) at substations
- The purpose is to improve the situation of poor interoperability due to different communication protocols adopted by various power suppliers for substation automation
- ICP is the first team in Taiwan to pass the 61850-10 international server certification